All Topics / Help Needed! / Order Of Things To Do In A Renovation
The forums are being retired.
After many years of great discussion, we've switched off new topics and replies. Every thread stays right here though, so you can still browse and search the whole archive any time.
For up-to-date chat with fellow investors, come join us on Facebook:
Why don't you do all of us a favour, write a item list for your renovation and give us some cost estimates? Less talk and more action, because I for one don't believe your numbers are even close to being real.
Don't kill yourself, just everything over $200.00, should only take 20 minutes max?
Thread Bare wrote:Why don't you do all of us a favour, write a item list for your renovation and give us some cost estimates? Less talk and more action, because I for one don't believe your numbers are even close to being real.Don't kill yourself, just everything over $200.00, should only take 20 minutes max?
I accept your challenge and will post a break down of cost tonight. However, don’t forget I am doing the work myself so no Labor involved. I will have figures for you tonight.
As requested, here is my break down of costs for a renovation I am about to under take in December.
The IP was purchased for just under $600K, 3 bedroom weather board house on a 696sqm block, 15km to the CBD. House was built early 1960’s.
Renovation includes:
• Restump back section of house,
• Entire new bathroom with second toilet and removing linen cabinet to make bathroom bigger,
• New kitchen with vinyl wrap doors and laminate bench top,
• Tiled floor through out
• carpet to 3 bedrooms,
• Built in robes to all bedrooms
• Remove section of wall between lounge and dining area to become oneThese prices are not for every one. I am a cabinet maker by trade and also a builder so don’t work off my pricing for your renovations. I have all tools / machines so don’t need to purchase or hire equipment. Not all materials are from Bunnings – the trick is to source materials at a reasonable cost, Bunnings doesn’t help here. Also you need to work smart, not hard.
• Restumping: includes changing 10 stumps. $400
• New bathroom: includes adding toilet, shower, bathtub, etc. Not including floor tiling. $1300
• New kitchen: including appliances $2900
• Tile through out including bath floor (approx 60sqm). Prices include glue and cement sheeting. $1600
• Carpet to 3 bedrooms $1000
• Built in robes in 3 bedrooms $1400
• Removing section of wall $500TOTAL: $9100
I think if I had to project manage it would probably be around the $50K mark. Should hopefully increase value by a fair bit.
I renovated another IP this time last year for $6K exact. The renovation was nothing fancy but still modern. This included: new kitchen and bathroom, new paint work, tiled kitchen and laundry floor, polished floor boards, basic landscaping and cut down a large tree in the back yard.
Sounds great. We typically spend $15K (no restumping or built ins- well sometimes one and we usually polish floors- except carpet bedrooms) and full painting. But we pay a tiler to waterproof and tile and a builder a few days (my hubby's too rough).
Why Vinyl wrap doors?? We go poly, much nicer finish. Where do you get your kitchens? Flat pack? I put together one cupboard once. Never again.
Hi catalyst,
I’ll be making the kitchen as I have a cabinet making business. I find vinyl wrap very durable as long as they are made right. otherwise they peel. I could go plain laminate but the IP is in a good suburb so don’t want a cheap look.
Poly is nice, but chips like hell.




