I am in need of advice on the 'order of things to get done'.
I have a long settlement (4months) in place with time to set up my contractors , dad (retired brickie) and potential minions to be ready to go to work on settlement date.
I then plan to move in after 2 months of initial renovations, with my wife and I wanting to have the house straightened, rewired, walls and floors done, updated bathroom and kitchen, heating and cooling installed.
It is a little 'up and down' on original redgum stumps – but not too bad-; hardwood floors underneath carpet and lino; has horsehair plaster walls and wallpaper; crummy bathroom with asbestos shower over bath recess; no heating; probably no insulation; some lights work, some don't; electric heated water container up in the ceiling somewhere.
What is the ORDER of doing a typical '1st stage' renovations job like this, to happily move my wife and child into this place after a 2 months?
Have I missed anything?
Thanks,
SirDangerMouse.